The Cloud Comes to You: How AWS, Microsoft, Google and Oracle Put AI Factories Inside Customers' Buildings
For fifteen years the big clouds told customers to move everything to them. Sovereignty rules and AI's hunger for sensitive data have reversed that for some of their most valuable customers. Every major cloud now offers a version of itself that runs inside the customer's own building, sometimes cut off from the internet entirely, with AI models included. This part compares the four offerings, the customers using them and the catch.
1. Four offerings
The hyperscalers' on-premises AI clouds
Tap a provider for its case file.
2. Timeline
The cloud moves on-premises, 2019 โ 2026
One lane per provider. Solid dots are confirmed by the provider, hollow dots come from the press, โ ๏ธ marks claims we could not confirm and dashed dots are planned. Click a dot for its source.
The idea is not new. Oracle launched Dedicated Region, the full Oracle cloud in a customer's data center, in July 2020, with Nomura Research Institute and Oman's government among the first customers. AWS sold racks of its own hardware for customer sites as Outposts from 2019. What changed in 2025 is AI: the offerings now include large GPU clusters and frontier models, and some run with no connection to the provider at all.
3. The bet: keep the software, give up the building
A hyperscaler's profits come from its software and services as much as its hardware. If a ministry or bank will not move its data to the public cloud, the next-best outcome is that it runs the provider's software stack, tools and models in its own building, rather than a rival's or an open-source stack. That keeps the customer on the provider's platform, sells its chips (Trainium, for AWS), and positions it for the day rules relax.
4. Side by side
| AWS AI Factories | Microsoft sovereign private cloud | Google Distributed Cloud | Oracle Dedicated Region / Alloy | |
|---|---|---|---|---|
| Launched | Dec 2025 | Azure Local (2024); disconnected AI 2026 | GDC (2021); Gemini GA on air-gapped Aug 2025 | Dedicated Region Jul 2020; Region25 Oct 2025 |
| Chips | NVIDIA GPUs or AWS Trainium | Customer or partner hardware, including NVIDIA GPUs | NVIDIA GPUs | NVIDIA, including Blackwell; customer-owned GPU option |
| AI models | AWS AI services and foundation models | Foundry Local, large models for qualified customers | Gemini | OCI AI services with NVIDIA AI Enterprise |
| Disconnected? | Private-region style (connected) | Yes: disconnected operations | Yes: built to stay air-gapped | Connected to Oracle for operations |
| Who runs it | AWS | Customer, on Microsoft software | Customer (air-gapped) or Google | Oracle; partners run Alloy |
| Smallest size | ~$200M over 5 years (AWS executive) | A few servers (Azure Local) | Rack-scale configurations | Three racks (Region25) |
5. From connected to air-gapped
How disconnected can it be?
Move the slider from a private region linked to the provider to a fully air-gapped site. Support levels are our reading of the providers' public descriptions, simplified.
An air-gapped AI factory has real costs. Models must be delivered and updated by hand, security patches arrive on physical media or through tightly controlled transfers, and the provider's engineers cannot log in to fix problems. Google says its air-gapped offering does not need a connection to Google Cloud or the public internet to manage its infrastructure, services, APIs or tooling, and is built to stay disconnected permanently. Microsoft says Azure Local's disconnected operations are available worldwide, with large models on Foundry Local available to qualified customers.
6. Inside the building
Who owns what on the customer's site
A simplified diagram. Tap a part.
7. Customers
Named customers and partners
Only publicly announced names. Filter by provider.
The pattern is clear even from the few public names: governments and security agencies (Singapore, Oman, Bangladesh), telcos (Vodafone), financial services providers (NRI) and national champions (Humain). Most deployments, especially in defence and intelligence, are never announced. Oracle says 60 Dedicated Region or Alloy regions are live or planned worldwide.
8. The catch
9. Reading the numbers
- AWS
- AI Factories launched at re:Invent, Dec 2025: NVIDIA GPUs or Trainium, AWS networking, storage and AI services in the customer's data center; customer supplies space, power and connectivity; ~$200M over five years (AWS executive, as reported); Humain AI Zone with up to 150,000 chips. Outposts from 2019.
- Microsoft
- Azure Local disconnected operations available worldwide; Foundry Local large models for qualified customers; some components timed for Ignite (17โ20 Nov 2026); GA of all parts not confirmed.
- Gemini on GDC air-gapped generally available Aug 2025; connected version then in preview; CSIT, GovTech Singapore and HTX among first users; Teradata sovereign cloud on GDC air-gapped in private preview (Oct 2026); Forrester Wave leader (2026). A later expansion with Blackwell Ultra and a newer Gemini model is reported by one source โ ๏ธ.
- Oracle
- Dedicated Region announced 8 Jul 2020 (NRI, Oman); Vodafone six regions (deal from 2022); Region25 from three racks (Oct 2025), Fujitsu a customer; 60 Dedicated Region or Alloy regions live or planned; customer-owned GPU option.
- AWS
- Amazon: new AWS AI Factories
- Network World: AWS AI Factories and data sovereignty
- DCD: AWS launches AI factory offering
- Microsoft
- Techzine: Microsoft sovereign cloud with on-premises AI
- SDxCentral: Microsoft drives its cloud offline
- Microsoft at NVIDIA GTC Berlin 2026
- Microsoft: build a sovereign private cloud with Azure Local
- SiliconANGLE: Gemini lands on Google Distributed Cloud
- CRN Asia: Gemini now available on GDC
- Google: Forrester Wave sovereign cloud leader 2026
- Teradata: sovereign AI on GDC air-gapped
- Oracle
- Oracle: Dedicated Region25 announcement
- DCD: three-rack Dedicated Region25
- DCD: Vodafone deploys six Oracle dedicated regions
- Oracle: customer-owned GPU
- Part 1: the four ways to get an AI factory